    2018-8-25  WMC (Olympic Dam Operations) Pty Ltd is the management company, a wholly-owned subsidiary of BHP Billiton Limited, which took over WMC Resources in mid 2005. Initially BP Minerals Ltd was a 49% partner in the enterprise, but WMC took over BP Minerals' share in 1993 for $315 million.get price

    BHP Billiton Olympic Dam Sulphuric Acid Plant

    Provide valuable technical advice, project management and execution of the sulphuric acid plant vessels and associated components including online welding repairs. Australia Standard Compliance We ensure that we meet all relevant Australian and International Standards relating to fully encapsulated suits, self-contained breathing apparatusget price

    Water stewardship at Olympic Dam BHP

    Acid plant: Olympic Dam produces 98 per cent sulphuric acid onsite from the sulphur dioxide produced in the smelting process. This requires high-quality water produced by treating GAB water onsite. Managing our water impacts We do this at Olympic Dam by:get price

    Monitoring Program Airborne Emissions BHP

    2020-9-11  Monitoring Program Airborne Emissions Olympic Dam Olympic Dam Document No. 2788 V.18 Page 3 of 14 Uncontrolled when printed Off-gas from the Flash Furnace is directed to the Electrostatic Precipitator, which removes particulate matter for recycling to the furnace before being directed to the Acid Plant. Here, the sulphur dioxide (SO 2get price

    Acid Plant Database Sulphuric Acid

    2021-4-21  Sulphuric Acid Plant Specifications . Google Search . Acid Plant Database March 10, 20 21. BHP Billiton Kalgoorlie BHP Billiton Olympic Dam First Quantum Ravensthorpe Energy Resources of Australia (SD) Incitec Pivot Mount Isa Minara Resources Nyrstar Hobartget price

    Tenders BHP Olympic Dam Bismuth and Antimony

    The BARS plant will be located at the BHP Olympic Dam facility near Roxby Downs in South Australia. It will treat a side stream of electro refinery electrolyte, using ion exchange (IX) technology, to remove Bismuth (Bi) and Antimony (Sb). acid to strip the Bi and Sb. The resin is then regenerated using dilute sulphuric (H2SO4) acid andget price

    Olympic Dam Copper-Uranium Mine, Adelaide,

    2021-4-9  The Olympic Dam mine produced 194,100t of copper, 4,045t of uranium oxide, 111,368oz of refined gold and 982,000oz of refined silver in 2011. At the end of October 2008, BHP Billiton announced that it expects to complete the first of the mine’s five get price

    About us Sulphuric Acid Plant Management and

    We are specialists in our field with over 30 years of experience in sulphuric acid plant management, shut-down execution and maintenance services. Our unique in house maintenance procedures and fully equipped onsite workshops minimise downtime and get price

    Careers Sulphuric Acid Plant Management and

    Acid Plant Specialised Trades Assistants If you have industry experience, can produce high quality results and demonstrate your attention to detail we’d love to hear from you. Contact us today if you are interested in joining the Acid Plant Management Services get price

    Steven Dearman Senior Specialist Planning

    BHP Billiton Olympic Dam Apr 2010 Nov 2012 2 years 8 months. Olympic Dam Project Manage various minor maintenance projects through out the Smelter, Acid Plant & Feed Preparation areas including demolition and removal of redundant plant. Sulphuric Acid Sulphuric Acid get price

    职位: Senior Specialist Planning

    Heap Leaching Method BHP Billiton Olympic Dam

    BHP Billiton Olympic Dam Corporation Pty Ltd (Melbourne, Victoria, AU) International Classes: (heap leach raffinate liquor) and concentrated sulphuric acid. The concentrated sulphuric acid was added at a concentration in the range of 0 to approximately 20 kg/tonne of ore. The optimal addition was in the range of 6 to 12 kg/ton ore. Theget price

    BHP: Olympic Dam, Spence outages cut copper

    Copper output at the Olympic Dam mine, 560km north of Adelaide, decreased by 21 per cent to 33,000 tonnes as a result the unplanned acid plant outage since August.. The incident at the sulphuricget price

    Acid Plant Database Sulphuric Acid

    2021-4-21  Sulphuric Acid Plant Specifications . Google Search . Acid Plant Database March 10, 20 21. BHP Billiton Kalgoorlie BHP Billiton Olympic Dam First Quantum Ravensthorpe Energy Resources of Australia (SD) Incitec Pivot Mount Isa Minara Resources Nyrstar Hobartget price

    Tenders BHP Olympic Dam Bismuth and Antimony

    The BARS plant will be located at the BHP Olympic Dam facility near Roxby Downs in South Australia. It will treat a side stream of electro refinery electrolyte, using ion exchange (IX) technology, to remove Bismuth (Bi) and Antimony (Sb). acid to strip the Bi and Sb. The resin is then regenerated using dilute sulphuric (H2SO4) acid andget price

    BHP delays Olympic Dam expansion The Northern

    BHP Billiton’s (BHP-N, BLT-L) decision to delay a US$30-billion dollar expansion of its Olympic Dam copper-uranium-gold mine in South Australia due to escalating capital costs will put a forecasted uranium supply deficit under even greater pressure, analysts say.. Edward Sterck of BMO Capital Markets in London points out that the copper-gold-uranium expansion project had been expected toget price

    BHP delays expansion of Olympic Dam Canadian

    BHP Billiton’s decision to delay its multi-billion dollar expansion of Olympic Dam due to escalating capital costs will put a forecasted uranium supply deficit under even greater pressure, analysts say.. Edward Sterck of BMO Capital Markets in London points out that the expansion of the copper-gold-uranium project had been expected to boost annual production from about 10 million lb of U 3 Oget price

    Mine Details MiningLink.au

    Olympic Dam is the Largest Underground Mine in Australia The Olympic Dam operation is a very large polymetallic undertaking with probable and proven copper ore reserves totalling 717 million tonnes, grading at 1.7 percent copper and 0.5 kilogram a tonne of uranium oxide. It is the largest known uranium ore body in the world, the fifth largestget price

    Time, cost and complexity continue to shape the heap

    2019-11-8  BHP currently has a batch leach system in. place which samples the stopes scheduled for . upcoming production, allowing the leaching process to be optimised in terms of acid addition, oxidant addition and temperature. This process might be accurate, but it is slow. and costly, according to Lawson. This has led both ANSTO and the Olympic Damget price

    Ravensthorpe Nickel Project Adsorption Tank

    2017-1-23  Olympic Dam Concentration Leach Tanks Industry: Mining Product: VEF and VE as a Veil Coat Expertise: Internal Tank Coating Six Concentrate Leach Tanks containing sulphuric acid at 12% and 80oC and pH less than 1 had two problems. Corrosion and get price

    Steven Dearman Senior Specialist Planning

    BHP Billiton Olympic Dam Apr 2010 Nov 2012 2 years 8 months. Olympic Dam Project Manage various minor maintenance projects through out the Smelter, Acid Plant & Feed Preparation areas including demolition and removal of redundant plant. Sulphuric Acid Sulphuric Acid -View Steven’s full profile See who you know in common Get introducedget price

    职位: Senior Specialist Planning

    Heap Leaching Method BHP Billiton Olympic Dam

    BHP Billiton Olympic Dam Corporation Pty Ltd (Melbourne, Victoria, AU) International Classes: (heap leach raffinate liquor) and concentrated sulphuric acid. The concentrated sulphuric acid was added at a concentration in the range of 0 to approximately 20 kg/tonne of ore. The optimal addition was in the range of 6 to 12 kg/ton ore. Theget price

    Olympic Dam expansion on fast track InDaily

    BHP is proposing for a staged increase in copper production at Olympic Dam from 200,000 to up to 350,000 tonnes per annum. Get InDaily in your inbox. Daily. The best local news every workday at lunch time. Thanks for signing up to the InDaily newsletter.get price

    Olympic Dam Copper-Uranium Mine, Adelaide,

    2021-4-9  The Olympic Dam mine produced 194,100t of copper, 4,045t of uranium oxide, 111,368oz of refined gold and 982,000oz of refined silver in 2011. At the end of October 2008, BHP Billiton announced that it expects to complete the first of the mine’s five-stage expansion by 2013, boosting annual production capacity to 200,000t of copper, 4,500t ofget price

    (PDF) Use of Geometallurgy to Predict Tailings Leach

    Use of Geometallurgy to Predict Tailings Leach Acid Consumption at Olympic Dam. September 2011; Conference: THE FIRST AUSIMM INTERNATIONAL GEOMETALLURGY CONFERENCEget price

    Time, cost and complexity continue to shape the heap

    2019-11-8  BHP currently has a batch leach system in. place which samples the stopes scheduled for . upcoming production, allowing the leaching process to be optimised in terms of acid addition, oxidant addition and temperature. This process might be accurate, but it is slow. and costly, according to Lawson. This has led both ANSTO and the Olympic Damget price

    Ravensthorpe Nickel Project Adsorption Tank

    2017-1-23  Olympic Dam Concentration Leach Tanks Industry: Mining Product: VEF and VE as a Veil Coat Expertise: Internal Tank Coating Six Concentrate Leach Tanks containing sulphuric acid at 12% and 80oC and pH less than 1 had two problems. Corrosion and get price

    10t circular crane Crane Services from Eilbeck Cranes

    The company has a licence to mine the Olympic Dam until 2036 and it is extendable for 50 more years thereafter. Ore processing at BHP's project. Processing facilities consist of a copper concentrator, hydrometallurgical plant, copper smelter, sulphuric acid plant, copper and gold/silver refineries.get price

    South Australia on the World Stage

    2019-6-24  • BHP Olympic Dam infrastructure upgrades & SMA expansion spent $669m in FY2018 and ongoing • OZ Minerals –Carrapateena copper-gold mine under construction (capital spend +$400m in 2019) Q4 2019 commissioning + studies underway for a $1.3 bn expansion in 2026 to double production. • GFG Alliance –Whyalla steelworks $600m capitalget price

    MARIO EDUARDO ROSSI, MSc., Min.Eng. GeoSystems

    2019-5-29  BHP Billiton Base Metals, Olympic Dam (March–November, 2014). Support in the development of the 2015Recoverable Resource Model, Underground Expansion areas, Cu, U, Au, Ag, BaS, and Density variables. Included development of methodology, checks and validations, and JORC compliance tests for all tasks related to the resource modeling work.get price

    Jeanette Sullivan Program Lead BHP LinkedIn

    Olympic Dam, South Australia Project delivery from design, identification and selection phases to commissioning, handover and closeout Multi-disciplinary project delivery; ore floatation piping, replacement of concentrated sulphuric acid piping, slimes processing, gold decantation, acid unloading facility ISP and DP studiesget price

    职位: Program Lead, MIEAust CPEng,